Innovative Aqua Systems, Inc.
  • Innovative Products
  • Videos
  • Store
  • Blog
  • Feedback
  • Contact
New pool plaster, filling & brushing (click here) 11/12/2010
0 Comments
 
New pool plaster, filling & brushing

·         When the plaster surface application is complete, begin filling the pool with your garden hose. The end of the hose should  be wrapped with a protective cloth to protect the newly plastered surface. The filling process will take approximately 24 hours depending on pool size and water pressure. IMPORTANT: Allow the water to fill the pool continuously until it reaches half way up the width of your waterline tile. DO NOT STOP filling the pool FOR ANY REASON until the water reaches this point! If the filling process is stopped before the water level reaches the tile, a “ring” will be left in the plaster around the perimeter of the plaster surface. Once the pool is full, the water can be shut off, the hose pulled out of the pool and the brushing process can begin.

·         NOTE: if you have a PebbleTec or PebbleSheen surface in your pool, this brushing of the surface during the curing process is not necessary. These two PEBBLE products are applied and subsequently washed free of dust and most particulates.

·         During the first week, it is very important to brush the plaster finish surface (floors, walls, steps and benches) as often as possible. 2-3 times a day for the first 5-7 days. Run the filter continuously until the water is clear. Continuous filtration helps speed up the elimination of plaster dust and can filter out the dust, dirt and other fine particulates that make the water look cloudy.

·         Begin brushing with the brush at the tile line and then forcefully drive the brush downward along the pool walls and across the bottom, in the direction of the main drain. To help clear out the “dust”, it’s more effective to have the main drain open and the skimmer closed down while brushing. IMPORTANT: DO NOT close skimmer off completely. This may cause an insufficient intake of water into the pump, creating a situation know as cavitation.

·         It can take 2 to 3 months before plaster can be considered cured. During this time dirt can attach itself to the plastered surface. Frequent brushing will prevent this. In addition, the brushing will further smooth and “polish” the surface and help to clean the plaster dust out of the pool

·         Newly plastered pools & spas should not be heated for at least 10 days after plaster in complete. Heating spas before plaster is cured will result in discoloration of spa plaster
 


Comments




Leave a Reply

    RSS Feed


Web Hosting by iPage